Of the energy-saving opportunities evaluated, one initiative was identified with potential energy savings of 30%, a payback period of 3.7 years and carbon savings of 5.3t CO2-e per year. The energy audit report included an initiative to relocate the 11kW irrigation pump to the other redundant pump site to use the larger bore pipework and eliminate a 90-degree bend on the discharge.