Of the energy-saving opportunities evaluated, two initiatives were identified with potential energy savings of 19%, a payback period of 2.8 years, and carbon emission savings of 20.9 tCO2-e per year. The energy audit recommended the upgrade of Pump 2 to a high-efficiency model with the installation of a variable speed drive (VSD) to ensure the pump operates closer to the best efficiency point under its various duty loads.